The Ultimate Quilting 10-Video Collection + Free Quilting Project Calendar

$41.99

You Save 70%
K3128Q

Description

10-Video Set: The Ultimate Quilting Collection (DVD + Download)

This mega set features the most comprehensive list of quilting tips, techniques, ideas, embellishments, designs and solutions- a must have for any quilter. In this set you will learn the importance of value and visual texture when it comes to designing a quilt, as well as how to work with monochromatic and neutral fabrics.

You will also see fun, new ideas like adding foil to a project for extra glitz and sparkle, designing with metal and how to work with lutrador. Better understand how to prep a quilt top, baste your layers together and quilt your next quilt as well as how to add the perfect finishing touches. You will also learn how to create a fun fabric landscape, how to sew and use fabric beads, how to apply a curved binding and much, much more.

Over 13 hours of content, PLUS you’ll receive this video in both DVD and download form. This way, you can save the instruction on any device you wish, and watch it anytime, anywhere!

Artistic Ideas & Design Techniques – 96 minutes

Chapter Topics:

  • Techniques Revealed: Fuse, Cut & Sew Flip Flop Butterflies
  • Every Quilt Has Two Sides Sides
  • Fabric Focus: The Importance of Value & Visual Texture
  • Finishing Touches: Binding Basics
  • Try Something New: Glimmer & Glitz
  • Reaching Out: Organizing & Participating in Round Robins
  • Tool Center: Many Uses for Add-A-Quarter
  • Techniques Revealed: Creating Fabric Beads

Fresh Ideas and Design Techniques – 90 minutes

Chapter Topics:

  • Techniques Revealed: Positive – Negative Applique
  • Design Workshop: Machine Quilting with Variegated Threads
  • Try Something New: A little Hanky Panky
  • Techniques Revealed: Designs with Metal
  • Every Quilt Has Two Sides
  • Fun & Fanciful: Strippy Landscapes
  • Color Inspirations: Working with Monochromatic Fabrics
  • Tool Center: Add – Enough

Stunning Designs and Techniques – 85 minutes

Chapter Topics:

  • Finishing Touches: Curved Binding
  • Techniques Revealed:  Building Layered Applique Motifs
  • Try Something New:  Adding Glitz with Foil
  • Every Quilt Has Two Sides
  • Quick Tip: Measuring for Borders
  • Color Inspirations:  Working with Neutral Fabrics

Creative Ideas and Fun Techniques – 87 minutes

Chapter Topics:

  • Techniques Revealed:  Wool Applique
  • Finishing Touches:  Mitered Border
  • Fun & Fanciful:  Creative Piecing with Strips
  • Try Something New:  Fun, Fabulous Lutrador
  • Every Quilt Has Two Sides
  • Creative Shortcuts:  Making Charm Square Totes 
  • Color Inspiration:  Using Dynamic Direct Compliments

Clever Tips for the Savvy Quilter – 63 minutes

Chapter Topics:

  • Techniques Revealed:  Mono Printing 
  • Color Inspiration:  Managing Contract with Color & Value
  • Every Quilt Has Two Sides
  • Design Workshop:  Using Stripes in Quilts
  • Quick Tip:  Satin Cord Binding

The Embellished Quilt – 93 minutes

Chapter Topics:

  • Paper Clay Demonstrations
  • Applying Hot Fixed Metal
  • Embellishing from Start to Finish
  • Basting the Quilt
  • Quilting the Quilt
  • The Finishing Touches

Fancy Ideas for the Fabulous Quilter – 65 minutes

Chapter Topics:

  • Quick Tips: Tips to Improve Your Piecing
  • Techniques Revealed: Understanding Scale
  • Fun and Fanciful: Layered & Luscious
  • Trying Something New: Using an Applique Pressing Sheet
  • Color Inspiration: Getting to Know Color

Creative Techniques, Designs & Solutions – 68 minutes

Chapter Topics:

  • Techniques Revealed: Fun Finishes for Raw Edges
  • Design Workshop: Painted, Wired and Stitched
  • Fabric Focus: Fun Effect with Stripes
  • Color Inspiration: Working in a Series

Quilt and Color – 99 minutes

Chapter Topics:

  • Quilt Free Style
  • Designing and Prepping the Quilt Top
  • Inking the Quilted Design

Skillful Approaches to Magnificent Quilts – 55 minutes

Chapter Topics:

  • Techniques Revealed: Cute Applique Blocks
  • Design Workshop: Disappearing Blocks
  • Fabric Focus: Japanese Taupe Fabrics
  • Techniques Revealed: Easy Batik

FREE Quilters Project Planner ($20 value)

Plan a year of quilting projects!

This delightful planner is designed especially for quilters so that you can track multiple projects throughout the year—because let’s face it, who doesn’t have lots of projects going at once?! Set your project goals, track your progress, and manage your time and works-in-progress (WIPs). Each project has four pages to track and record all the critical details: construction notes, pattern info, block layout, due dates and tasks, your supply list, and more. Plus, flip to the back of the planner for a quilting reference section and even more handy tools.

More to Explore

Designing a Work of Art: Quilting Ideas & Techniques 3-DVD Set

Designing a Work of Art: Quilting Ideas & Techniques 3-DVD Set

Description 3-DVD Set: Designing a Work of Art: Quilting Ideas & Techniques This 3-DVD set features our top selling DVDs by mixed media artist Heather Thomas. This multi DVD set features over 4-1/2 hours of tips and techniques on three DVDs including: Quilt & Color, Fabric Painting and The…
Hand Dyeing Fabric DVD

Hand Dyeing Fabric DVD

Description DVD This DVD is all about creating that truly unique, one-of-a-kind quilt. Our quilting instructor, Heather Thomas, will teach you the steps to make your very own hand dyed fabric for your quilt. You will learn how to make the dye as well as the different patterns to…
Concepts & Techniques You Have Never Seen Before 3-DVD Set

Concepts & Techniques You Have Never Seen Before 3-DVD Set

Description 3-DVD Set Let these innovative designs and ideas in this DVD pack inspire you to express your inner creativity for your quilting projects. Our quilting instructor, Heather Thomas, will take you on a step-by-step process in learning how to hand dye fabric, fabric paint with handmade stamps, and…